Allegheny Garage
Morabito Consultants provided structural engineering and waterproofing consulting services for the repair and strengthening of the 5.5-level, 122,580-square-foot cast-in-place concrete Allegheny Plaza Parking Garage in Towson, Maryland. Because the garage is constructed over occupied office space, the repair program required careful coordination to maintain building operations during construction.
Detailed investigations identified decades of deterioration, including widespread concrete distress in slabs, beams, and columns, as well as overstressed structural elements. Morabito Consultants prepared repair documents for concrete restoration, structural strengthening, installation of a new exterior car barrier system, and replacement of the traffic-bearing waterproofing membrane at the top-level parking deck.
The firm also provided bid phase support and construction administration services, including shop drawing review, periodic site inspections, and contractor coordination throughout the multi-phase parking garage rehabilitation. The completed improvements addressed critical structural deficiencies, mitigated water infiltration, and extended the service life of the parking structure while reducing long-term maintenance needs.

